December 2009
Soitec S.A. acquires Concentrix Solar GmbH.

July 2009
Concentrix Solar achieves a system efficiency of 25% AC. Concentrix Solar installs first demonstration system in San Diego, California, USA.

May 2009
Concentrix Solar confirms 23% AC system efficiency of its commercial power plants.

September 2008
The 25 MW production line is brought into operation.

May 2008
The demonstration system in Seville, Spain reached peak system efficiencies of 23% AC during regular operation.

February 2008
Concentrix Solar constructed the 100 kW unit for the concentrator PV large power plant in Puertollano, Spain. Founding of Concentrix Iberia, a joint venture from Concentrix Solar and Abengoa Solar.

December 2007
Begin of the construction work in Puertollano for the first building phase of the large power plant in Castilla-La Mancha, Spain for which Concentrix Solar is contributing 500 kW.

November 2007
Abengoa Solar becomes investor in Concentrix Solar.

October 2007
Concentrix Solar successfully passes the type tests of its 5.75 kW system and fulfills all of the technical criteria according to the international IEC Norm 62108 for the construction of its 500 kW power plant in Castilla-La Mancha, Spain.

August 2007
First demonstration power plant is successfully brought into operation in Lorca, Spain.

November 2006
As a result of an international competition, Concentrix Solar is awarded a contract to participate with 500 kW power in the construction of the biggest yet concentrator PV power plant in Spain.

October 2006
In Freiburg, a 5 kW system is brought into operation.

September 2006
The pilot production line for FLATCON® modules is brought into operation.

August 2006
The module efficiency achieves 26%.

February 2006
Good Energies becomes investor in Concentrix Solar.

June through December 2005
First demonstration systems are installed at different locations e.g. Freiburg and Cyprus.

February 2005
Concentrix GmbH 2005 is founded as spin-off company of Fraunhofer ISE.